Skip to content

Bella Italia - Basildon

Bella Itallia basildon

Project | The electrical fit out of a restaurant in Basildon, Essex

Work Undertaken | This 8 week project ended at the start of March 2016. As it was an empty industrial unit, a full electrical fit out was carried out. This included the installation of the mains, with a Hager 200 amp 3 phase MCCB Panel, and the supply and installation of an additional 5 distribution boards at various locations around the restaurant.

Alongside the electrical fit out, we also completed the installation of all tray and containment throughout the premises, as well as the full fit out of the industrial kitchen and all front-of-house lighting and small power, as per client drawings.

All work carried out was fully tested and certificated.

Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon
Bella Itallia basildon